Install tray material in accordance with engineering drawings
using standard cable tray support materials.
Rig and pull cables into tray with attention to phasing and
make provisions for cable supports.
Cable supports installed in the welded segment brackets
assure ampacity and short circuit bracing.
Terminate cables in tap or entrance boxes.
Regroup each phase following engineering drawings.
Assemble and seal all environmental and
equipment seals to prevent moisture penatration.
Finalize the tray support system and
install ventilated covers on entire cable bus system.
Inspect and test installation before energizing system.